Contact Us
Tell us what you are driving, where it parks and what your meter box looks like, and we will come back with a real price rather than a range.
- Phone
- 07 5681 8534
- Hours
- Monday to Friday, 8am to 5pm
How we can help
A new installation
Home, commercial or strata. Use the form and include the meter box photo if you have one.
Charger repairs and servicing
Fill in the form below and we'll get back to you shortly.
A site with more than one charger
Workplaces, apartment buildings, car parks and depots. Tell us how many bays and we will start with your supply.
Tell us about the job
No obligation, and no sales call afterwards if the answer is not for you.
Before you write
Four Things That Turn a Question Into a Price
You do not need any of these to get in touch. But if you have them, the first reply is a number instead of another question.
A photo of your open meter box
It tells us whether you are single or three phase, what spare capacity the board has, and whether the board itself needs work. It is the single most useful thing you can send.
What you drive, or what you are about to
Every car has its own charging ceiling. Knowing the model stops us quoting output your vehicle cannot take.
Where the car parks, and how far that is from the board
The cable run is usually the largest variable in the price. A rough number of metres, or a photo from the board looking towards the car, is plenty.
Whether you have solar or a battery, or plan to
They share the same supply and the same switchboard. If any of it is coming, we would rather plan the charger around it now than move it later.
After you get in touch
What Happens Next
- 01
We read what you sent and come back with questions or a price
If the meter box photo answers it, you get a price. If it does not, we will tell you exactly what is missing rather than quoting around it.
- 02
We look at the site if the job needs it
Anything involving a supply upgrade, a body corporate, a long run or a commercial site gets looked at properly before a number goes on paper.
- 03
You get a fixed price with the switchboard work in it
Including any board work and any network application the job needs. Those are the two things that turn into a phone call on install day when they have been left out.
- 04
We install, test and commission it
Tested to AS/NZS 3000 before it is energised, checked under a real charge, and you get the certificate of testing and compliance along with our ten year workmanship warranty.

